IAA USAEnded · yesterdayRuns & drivesKeysSalvageLos Angeles (California)
2022 BMW M5 · VIN WBS83CH03NC******
VIN Lot #
Save this vehicle
Create a free SalvageAlert account to save lots, track prices and get auction alerts.
Pricing
Open on IAA USA →Full vehicle specifications
- Make
- BMW
- Model
- M5
- Model year
- 2022
- Series
- 5-Series
- Body style
- Sedan/Saloon
- Vehicle type
- PASSENGER CAR
- Doors
- 4
- Cylinders
- 8
- Displacement
- 4.4 L
- Engine power
- 600 hp
- Fuel
- Gasoline
- Manufacturer
- BMW M GMBH
- Assembly country
- GERMANY
- Assembly plant
- DINGOLFING
- Gross weight (GVWR)
- Class 1: 6,000 lb or less (2,722 kg or less)
Decoded from the VIN via the U.S. NHTSA vPIC database — free public data.
Similar BMW M5 lots

Copart USA · ELGIN, IL
2019 BMW M5
FRONT END

Copart USA · HOUSTON, TX
2019 BMW M5
WATER/FLOOD

Copart USA · SUN VALLEY, CA
2020 BMW M5
FRONT END

Copart USA · BROOKHAVEN, NY
2026 BMW M5
WATER/FLOOD
Bid US$35,500

IAA Canada · Oshawa, ON
2025 BMW M5
Right Front
Bid CA$52,400

Copart USA · MIAMI, FL
2019 BMW M5
UNDERCARRIAGE
Bid US$15
Track this vehicle across every relisting
Sign up to add this VIN to your watch list and get notified whenever it (or a similar vehicle) appears on IAA or Copart. Free to start, no card required.
Create a free account